100 cubic meter mixed waste based biogas to power application project under Gobardhan scheme in Mangaon, Kolhapur

  • »
  • Projects
  • »
  • 100 cubic meter mixed waste based biogas to power application project under Gobardhan scheme in Mangaon, Kolhapur

100 cubic meter mixed waste based biogas to power application project under Gobardhan scheme in Mangaon, Kolhapur

The proposed project is aimed to supply biogas to power generation. This type of project could help to reduce green house gas emission in to the atmosphere & dependency on fossil fuel for cooking and make Mangoan as self & Eco-Friendly village. These types of Wet Organic Waste have enormous potential for renewable energy (biogas) generation & also Bio-Manure generation

Location

Kolhapur

Capacity

1.5-2.0 TON PER DAY

Gas Generation

100 CUBIC METER PER DAY

Power Generation

125-150 KWH(UNIT)

Fermented Organic Manure Generation (Solid)

150-200KG PER DAY

Fermented Organic Manure Generation (Liquid)

800-1000 LITRE PER DAY

100 cubic meter mixed waste based biogas to power application project under Gobardhan scheme in Mangaon, Kolhapur
100 cubic meter mixed waste based biogas to power application project under Gobardhan scheme in Mangaon, Kolhapur
100 cubic meter mixed waste based biogas to power application project under Gobardhan scheme in Mangaon, Kolhapur
100 cubic meter mixed waste based biogas to power application project under Gobardhan scheme in Mangaon, Kolhapur
100 cubic meter mixed waste based biogas to power application project under Gobardhan scheme in Mangaon, Kolhapur
Designed, Developed & Maintained by Lucid Edge Tech Serv